Hybrid Joint - List of Manufacturers, Suppliers, Companies and Products | IPROS

Hybrid Joint Product List

1~2 item / All 2 items

Displayed results

Expansion Device 【Hybrid Joint】 Construction Example Tokyo 01

We would like to introduce examples of construction for hybrid joints (NS to LL type) for bridges, which excel in water resistance and durability.

Crittec Industries Co., Ltd. not only sells products but often takes responsibility for installation work as well, striving to improve products by considering issues that arise during installation and the condition of damaged existing expansion joints that are removed. 【Construction Examples】 ○ Construction Location: Tokyo ○ Bridge Name: Suijin Ohashi Elevated Bridge ○ Products: NS-20 and others ○ Comments: Prime contract work. Soundproof sheets were installed, and noise reduction measures were implemented. CS-50 (one-sided steel deck type) was also used. For more details, please contact us or request a catalog.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Durability 100 years, expansion device, hybrid joint, type 3LII.

A bridge expansion device proven to last 100 years! No replacement needed for new bridges for 100 years! Long-term water-tightness, maintenance-free [NEXCO specification compliant product].

The Hybrid Joint 3LII type has a vertical integrated structure of the load support plate and anchor plate, making it highly durable and preventing damage from metal fatigue. Its durability is equivalent to an ultra-long term of 100 years! It has been proven through fatigue loading tests conducted by a third-party organization, clearing the equivalent of 12 million cycles, which corresponds to 100 years. This assumes that a 25-ton large vehicle has traveled over the 3LII type 12 million times, equating to a 100-year durability. The standard design supply period for bridges is 100 years. For newly constructed bridges, there is no need to replace the expansion device for 100 years. The 3LII type is maintenance-free, eliminating the need for sound inspection that requires traffic regulation, leading to reduced maintenance costs and improved safety. It is a product capable of accommodating large expansion ranges (150-350mm) and wide gaps (up to 730mm), making it one of the largest among expansion devices that have passed NEXCO standards. It has been widely adopted on highways nationwide as a product that meets NEXCO specifications. For more details, please contact us or request a catalog.

  • 3L?タイプ 550-550.jpg
  • 3L?タイプ 550-550 宇治川大橋.jpg
  • 3L?タイプ 飛越大橋 002.jpg
  • 3L?タイプ 沢内橋.jpg
  • 3L?タイプ 新地きずな橋 01.jpg
  • 3L?タイプ 550-550 3L?施工.jpg
  • 3L?タイプ 布志名高架橋.jpg
  • 3L?タイプ 新地きずな橋 02.jpg
  • Foundation construction
  • Bridge Materials
  • Hybrid Joint

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration